{"id":8320,"date":"2017-07-31T10:00:55","date_gmt":"2017-07-31T08:00:55","guid":{"rendered":"https:\/\/www.gereso.com\/actualites\/?p=8320"},"modified":"2021-07-19T16:47:23","modified_gmt":"2021-07-19T14:47:23","slug":"charges-de-personnel-cout-de-revient","status":"publish","type":"post","link":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/","title":{"rendered":"Charges de personnel et co\u00fbt de revient"},"content":{"rendered":"<p><span style=\"background-color: #d10016; color: #ffffff;\"> Article mis \u00e0 jour le 12 juillet 2021 <\/span><\/p>\n<h2><strong>La m\u00e9thode des co\u00fbts complets<\/strong><\/h2>\n<h3><strong>Calcul du co\u00fbt de revient : premi\u00e8re approche<\/strong><\/h3>\n<p>Pour d\u00e9terminer le <strong>co\u00fbt de revient <\/strong>d&rsquo;un produit ou d&rsquo;une prestation, la m\u00e9thode la plus connue est celle des <strong>co\u00fbts complets<\/strong>. Elle se base largement sur les donn\u00e9es fournies par les services comptables et notamment le compte de r\u00e9sultat. Rappelons que ce dernier ne permet de conna\u00eetre in fine que le montant du r\u00e9sultat net global de l&rsquo;exercice. La comptabilit\u00e9 g\u00e9n\u00e9rale ne permet pas de d\u00e9terminer le b\u00e9n\u00e9fice unitaire d\u00e9gag\u00e9 par chaque produit ou prestation de l&rsquo;entreprise. Un retraitement de ces chiffres est indispensable pour r\u00e9aliser cette d\u00e9marche.<\/p>\n<p>Dans les petites structures, ce calcul est r\u00e9alis\u00e9 par le service comptable lui-m\u00eame. Dans les moyennes et grandes structures, le <strong>contr\u00f4leur de gestion<\/strong> est souvent charg\u00e9 de cette t\u00e2che.<\/p>\n<h3><strong>Les charges incorporables <\/strong><\/h3>\n<p>Pour mener \u00e0 bien ce calcul, il faut partir des <strong>charges<\/strong> (comptes de la classe 6) de la comptabilit\u00e9 g\u00e9n\u00e9rale et \u00e9ventuellement exclure celles qui n&rsquo;auraient aucun caract\u00e8re \u00e9conomique ou en tout cas normal. On parle de <strong>charges non incorporables<\/strong>. Ainsi, on ne tiendra pas compte des charges exceptionnelles.<\/p>\n<h3><strong>Les charges directes<\/strong><\/h3>\n<p>La seconde \u00e9tape consistera pour un produit ou une prestation donn\u00e9e \u00e0 faire l&rsquo;inventaire de tous les co\u00fbts qui entrent directement dans son co\u00fbt de revient.&nbsp; Il s&rsquo;agit de co\u00fbts visibles dont l&rsquo;\u00e9valuation individuelle est facile et ne n\u00e9cessite pas de recalcul par l&rsquo;interm\u00e9diaire d&rsquo;une cl\u00e9 de r\u00e9partition. La plupart du temps, on retrouvera dans cette cat\u00e9gorie, appel\u00e9e <strong>\u00ab\u00a0charges directes\u00a0\u00bb<\/strong>, la mati\u00e8re premi\u00e8re et le co\u00fbt du personnel qui interviennent directement dans la production du bien ou de la prestation.<\/p>\n<p>Cette \u00e9tape est relativement ais\u00e9e, on retrouve ces informations dans les factures pour les co\u00fbts unitaires de la mati\u00e8re et dans le bulletin de paye pour les salari\u00e9s affect\u00e9s uniquement \u00e0 la production.<\/p>\n<p>Ainsi pour une entreprise qui confectionne divers articles de bureau, le <strong>co\u00fbt direct<\/strong> d&rsquo;un stylo sera notamment compos\u00e9 de plastique, d&rsquo;encre, mais \u00e9galement de la r\u00e9mun\u00e9ration (brut + cotisations patronales) du personnel affect\u00e9 \u00e0 la cha\u00eene de production, rapport\u00e9 au temps pass\u00e9 pour la fabrication d&rsquo;un seul stylo.<\/p>\n<h3><strong>Les charges indirectes<\/strong><\/h3>\n<p>En ne prenant en compte que les charges directes (la mati\u00e8re et la main-d&rsquo;oeuvre directe), on oublie forc\u00e9ment de nombreuses autres charges qui peuvent difficilement \u00eatre individualis\u00e9es. On peut citer \u00e0 titre d&rsquo;exemple, les <strong>loyers<\/strong> des b\u00e2timents utilis\u00e9s, l&rsquo;<strong>amortissement<\/strong> du mat\u00e9riel utilis\u00e9, les assurances, mais aussi le personnel non affect\u00e9 \u00e0 la production.<\/p>\n<p>Pour le calcul du co\u00fbt de revient, ces co\u00fbts, appel\u00e9s \u00ab\u00a0<strong>charges indirectes<\/strong>\u00a0\u00bb posent probl\u00e8me. Quel montant du loyer annuel doit-on en effet affect\u00e9 au co\u00fbt de revient d&rsquo;un seul stylo ? Il sera n\u00e9cessaire de proc\u00e9der \u00e0 une analyse de ces charges indirectes et d&rsquo;utiliser plusieurs cl\u00e9s de r\u00e9partition. Dans les faits, on constate qu&rsquo;il y a bien plus de postes comptables qui constituent des charges indirectes que des charges directes.<\/p>\n<h2><strong>Main-d&rsquo;oeuvre directe et indirecte<\/strong><\/h2>\n<p>Le d\u00e9coupage charges directes \/ charges indirectes qu&rsquo;il est n\u00e9cessaire d&rsquo;effectuer en amont du calcul du co\u00fbt de revient, se retrouve au niveau des <strong>charges de personnel<\/strong>. On distinguera alors la main-d&rsquo;\u0153uvre directe (<strong>MOD<\/strong>) et la main d&rsquo;\u0153uvre indirecte (<strong>MOI<\/strong>).<\/p>\n<p>La notion de MOD d\u00e9pend beaucoup de l&rsquo;activit\u00e9 de l&rsquo;entreprise. Dans une entreprise industrielle, on retiendra la r\u00e9mun\u00e9ration et les charges patronales relatives au personnel de production. Pour une entreprise de formation, on retiendra le co\u00fbt de la r\u00e9mun\u00e9ration du formateur. Il n&rsquo;y a pas que la production qui fasse l&rsquo;objet de MOD. Pour les op\u00e9rations de distribution, les commissions en pourcentage de chiffre d&rsquo;affaires des commerciaux constituent \u00e9galement de la MOD.<\/p>\n<p>La <strong>MOD <\/strong>doit \u00eatre valoris\u00e9e pour un produit ou prestation unique en retenant :<\/p>\n<ul>\n<li>la r\u00e9mun\u00e9ration brute<\/li>\n<li>les charges patronales d\u00e9duction faite du CICE affect\u00e9 au salari\u00e9 (7% depuis 2017 pour les r\u00e9mun\u00e9rations brutes qui n&rsquo;exc\u00e8dent pas 2,5 SMICS)<\/li>\n<li>les autres charges de personnel qui d\u00e9pendent directement de la r\u00e9mun\u00e9ration (budget du comit\u00e9 d&rsquo;entreprise, assurances compl\u00e9mentaires, etc.), etc.<\/li>\n<li>les imp\u00f4ts et taxes assis sur les r\u00e9mun\u00e9rations (taxe d&rsquo;apprentissage, formation professionnelle continue, effort \u00e0 la construction).<\/li>\n<\/ul>\n<p>Toutes les personnes qui ne sont pas qualifi\u00e9es de \u00ab\u00a0MOD\u00a0\u00bb constituent de la main-d&rsquo;\u0153uvre indirecte. On retrouve principalement les charges de personnel des services fonctionnels (<strong>services achat, comptabilit\u00e9, paye, marketing, R&amp;D<\/strong>, etc.).<\/p>\n<h2><strong>La m\u00e9thode des co\u00fbts complets<\/strong><\/h2>\n<p>Les deux premi\u00e8res \u00e9tapes de la m\u00e9thode des co\u00fbts complets consistent :<\/p>\n<ul>\n<li>\u00e0 retirer pour les besoins du calcul du co\u00fbt de revient des charges de la comptabilit\u00e9 (charges r\u00e9elles ou charges pr\u00e9visionnelles), les charges dites <strong>\u00ab\u00a0non incorporables\u00a0\u00bb<\/strong>, car ne pr\u00e9sentant pas de caract\u00e8re \u00e9conomique (charges exceptionnelles comme les amendes par exemple)<\/li>\n<li>\u00e0 regrouper en 2 cat\u00e9gories distinctes les <strong>charges directes et indirectes<\/strong>.<\/li>\n<\/ul>\n<h3><strong>3\u00e8me \u00e9tape : le tableau de r\u00e9partition des charges indirectes<\/strong><\/h3>\n<p>La 3\u00e8me \u00e9tape consiste \u00e0 traiter les <strong>charges indirectes<\/strong>. L&rsquo;objectif est de les rendre \u00ab\u00a0individualisables\u00a0\u00bb afin de pouvoir affecter une quote-part de ces charges au de co\u00fbt de revient unitaire d&rsquo;un bien ou d&rsquo;une prestation.<\/p>\n<p>Cette individualisation va pouvoir s&rsquo;op\u00e9rer gr\u00e2ce \u00e0 des <strong>cl\u00e9s de r\u00e9partition<\/strong>. On proc\u00e8de g\u00e9n\u00e9ralement aux 2 phases suivantes :<\/p>\n<ul>\n<li>la <strong>r\u00e9partition primaire<\/strong> : r\u00e9partition des charges de la comptabilit\u00e9 dans quelques <strong>centres d&rsquo;analyse<\/strong><\/li>\n<li>le calcul du <strong>co\u00fbt d&rsquo;unit\u00e9 d&rsquo;\u0153uvre<\/strong> afin de r\u00e9partir le co\u00fbt des centres d&rsquo;analyse vers le co\u00fbt de revient unitaire du produit.<\/li>\n<\/ul>\n<h4><strong>La r\u00e9partition primaire <\/strong><\/h4>\n<p>La r\u00e9partition primaire consiste \u00e0 r\u00e9partir les charges indirectes de la comptabilit\u00e9 g\u00e9n\u00e9rale (loyers, assurances, charges de personnel des services fonctionnels, etc.) en quelques cat\u00e9gories appel\u00e9es <strong>centres d&rsquo;analyse<\/strong>. Ces centres reprennent g\u00e9n\u00e9ralement les services existants dans l&rsquo;entreprise (<strong>centre achat, centre production, commercialisation-distribution puis administratif<\/strong>).<\/p>\n<p>Cette r\u00e9partition ente ces 3-4 cat\u00e9gories est effectu\u00e9e charge par charge selon un crit\u00e8re physique logique. Le salaire du dirigeant sera ainsi g\u00e9n\u00e9ralement affect\u00e9 entre ces centres au prorata du temps pass\u00e9 pour chaque fonction (30% du salaire sera affect\u00e9 au service commercialisation &#8211; distribution si le dirigeant passe 30% \u00e0 participer \u00e0 la commercialisation des produits et services de l&rsquo;entreprise).<\/p>\n<p>Apr\u00e8s r\u00e9alisation de cette r\u00e9partition primaire, charge par charge (pour chaque compte de la classe 6), il est n\u00e9cessaire de faire le <strong>total de la<\/strong> <strong>r\u00e9partition primaire<\/strong> par centre d&rsquo;analyse. \u00c0 la fin de cette phase, on passe alors de plusieurs dizaines voire centaines de postes comptables et de montants diff\u00e9rents \u00e0 3-4 montants, soit un par centre d&rsquo;analyse.<\/p>\n<p>Lorsque le nombre de services et donc de centres d&rsquo;analyse est plus important, il est \u00e9galement possible de distinguer les <strong>centres auxiliaires<\/strong> des <strong>centres principaux<\/strong>. On consid\u00e8rera que les centres auxiliaires (centre entretien et maintenance, centre ressources humaines par exemple) fournissent des services aux autres centres principaux. Les centres auxiliaires sont ainsi, apr\u00e8s r\u00e9partition primaire, r\u00e9partis entre les centres principaux en proportion du niveau de service donn\u00e9 \u00e0 chacun de ces centres. On appelle cette \u00e9tape, <strong>la r\u00e9partition secondaire<\/strong>.<\/p>\n<h4><strong>Le co\u00fbt d&rsquo;unit\u00e9 d&rsquo;\u0153uvre<\/strong><\/h4>\n<p>La seconde phase du traitement des charges indirectes consiste pour chaque centre d&rsquo;analyse \u00e0 d\u00e9finir une <strong>unit\u00e9 d&rsquo;\u0153uvre<\/strong>, c&rsquo;est-\u00e0-dire une cl\u00e9 de r\u00e9partition qui permettra d\u2019affecter les charges indirectes d\u2019un centre au co\u00fbt de revient d\u2019un produit ou service. L&rsquo;unit\u00e9 d&rsquo;\u0153uvre choisie doit permettre de mesurer en volume le travail de chaque centre. Il faut qu&rsquo;il y ait <strong>corr\u00e9lation<\/strong> entre l&rsquo;unit\u00e9 choisie et le total du centre correspondant. Pour un centre d&rsquo;analyse \u00ab\u00a0achat\u00a0\u00bb, on choisira souvent comme unit\u00e9, le montant ou la quantit\u00e9 des achats de mati\u00e8res premi\u00e8res, car on consid\u00e9rera que plus le montant des approvisionnements est important et plus les frais de fonctionnement du centre achat (total de r\u00e9partition primaire) seront importants.<\/p>\n<p>Voici quelques exemples d&rsquo;unit\u00e9 d&rsquo;\u0153uvre fr\u00e9quemment utilis\u00e9es :<\/p>\n<ul>\n<li>centre <strong>achat<\/strong> ou approvisionnement : montant ou quantit\u00e9 d&rsquo;achat de composants et mati\u00e8res<\/li>\n<li>centre <strong>production<\/strong> : nombre d&rsquo;heures de main-d&rsquo;\u0153uvre directe ou quantit\u00e9 produite<\/li>\n<li>centre <strong>commercialisation-distribution<\/strong> : montant du chiffre d&rsquo;affaires ou quantit\u00e9 vendue<\/li>\n<li>centre <strong>administration <\/strong>: en l&rsquo;absence d&rsquo;unit\u00e9 de volume disponible, on utilise souvent le co\u00fbt de production des produits vendus.<\/li>\n<\/ul>\n<p>On calcule ensuite le co\u00fbt d&rsquo;unit\u00e9 d&rsquo;\u0153uvre = Total r\u00e9partition primaire (ou secondaire le cas \u00e9ch\u00e9ant) du centre \/ nombre d&rsquo;unit\u00e9s d&rsquo;\u0153uvre du centre.<\/p>\n<p>Le co\u00fbt d&rsquo;unit\u00e9 d&rsquo;\u0153uvre permet ensuite d&rsquo;affecter une quote-part de charge indirecte au co\u00fbt de revient du produit ou service.<\/p>\n<p><strong>Exemple : <\/strong><\/p>\n<p>Total r\u00e9partition primaire centre production (quote-part de loyers, assurances, etc., relatifs \u00e0 la production) = 1.000.000 \u20ac<\/p>\n<p>Unit\u00e9 d&rsquo;\u0153uvre choisie : le nombre d&rsquo;heures de main-d&rsquo;\u0153uvre directe (MOD)<\/p>\n<p>Nombre d&rsquo;unit\u00e9s d&rsquo;\u0153uvre : 100.000 heures de MOD<\/p>\n<p>Co\u00fbt de l&rsquo;unit\u00e9 d&rsquo;\u0153uvre : 1.000.000 \/ 100.000 = 10 \u20ac.<\/p>\n<p>Ces 10 \u20ac signifient que pour chaque bien vendu, en plus du salaire \u00e0 verser \u00e0 l&rsquo;agent de production (MOD), l&rsquo;entreprise subit dans le cadre du co\u00fbt de revient unitaire de ce produit, 10 \u20ac de charges indirectes de production.<\/p>\n<h3><strong>4\u00e8me \u00e9tape : le calcul du co\u00fbt de revient<\/strong><\/h3>\n<p>Une fois le tableau de r\u00e9partition indirecte termin\u00e9, la derni\u00e8re \u00e9tape consiste \u00e0 calculer le co\u00fbt de revient et le b\u00e9n\u00e9fice unitaire du produit. On proc\u00e8de g\u00e9n\u00e9ralement en plusieurs phases de calcul :<\/p>\n<ul>\n<li><strong>Co\u00fbt d&rsquo;achat<\/strong> = Achats de mati\u00e8res premi\u00e8res et composants + Frais directs d&rsquo;achat (transport) + Charges indirectes d&rsquo;approvisionnement imputables (affect\u00e9es au produit gr\u00e2ce au co\u00fbt d&rsquo;unit\u00e9 d&rsquo;\u0153uvre)<\/li>\n<li><strong>Co\u00fbt de production<\/strong> = Co\u00fbt d&rsquo;achat + Frais directs de fabrication (la MOD notamment) + Charges indirectes de production imputables<\/li>\n<li><strong>Co\u00fbt de revient<\/strong> = Co\u00fbt de production + Frais directs de commercialisation (commission du vendeur) + Charges indirectes de commercialisation et d&rsquo;administration imputables<\/li>\n<li><strong>R\u00e9sultat unitaire<\/strong> = Prix de vente &#8211; Co\u00fbt de revient<\/li>\n<\/ul>\n<p>En cas de vente d&rsquo;un bien, on prend \u00e9galement en compte les effets des stocks, surtout lorsqu&rsquo;ils ont \u00e9t\u00e9 acquis ou produits \u00e0 des co\u00fbts diff\u00e9rents.<\/p>\n<hr>\n<h2><strong>Co\u00fbt complet : exemple <\/strong><\/h2>\n<h3>Enonc\u00e9<\/h3>\n<p>L\u2019entreprise BTP + a un carnet de commande rempli pour presque toute l\u2019ann\u00e9e. Malgr\u00e9 cela, la rentabilit\u00e9 reste relativement faible eu \u00e9gard le succ\u00e8s et l\u2019image s\u00e9rieuse de l\u2019entreprise. Le compte de r\u00e9sultat de l&rsquo;ann\u00e9e derni\u00e8re se pr\u00e9sente ainsi :<\/p>\n<table style=\"width: 585px;\" border=\"1\">\n<tbody>\n<tr>\n<td style=\"width: 328px;\" colspan=\"2\"><strong>Charges<\/strong><\/td>\n<td style=\"width: 231px;\" colspan=\"2\"><strong>Produits<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\">Mati\u00e8res premi\u00e8res<\/td>\n<td style=\"width: 92px; text-align: center;\">360 000<\/td>\n<td style=\"width: 145px;\">Chiffre d&rsquo;affaires<\/td>\n<td style=\"width: 86px; text-align: center;\">750 000<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\">Autres achats et charges externes<\/td>\n<td style=\"width: 92px; text-align: center;\">120 000<\/td>\n<td style=\"width: 145px;\">&nbsp;<\/td>\n<td style=\"width: 86px; text-align: center;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\">Imp\u00f4ts et taxes<\/td>\n<td style=\"width: 92px; text-align: center;\">30 000<\/td>\n<td style=\"width: 145px;\">&nbsp;<\/td>\n<td style=\"width: 86px; text-align: center;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\">Charges de personnel<\/td>\n<td style=\"width: 92px; text-align: center;\">184 000<\/td>\n<td style=\"width: 145px;\">&nbsp;<\/td>\n<td style=\"width: 86px; text-align: center;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\">Dotations aux amortissements<\/td>\n<td style=\"width: 92px; text-align: center;\">30 000<\/td>\n<td style=\"width: 145px;\">&nbsp;<\/td>\n<td style=\"width: 86px; text-align: center;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\"><strong>Total&nbsp; charges<\/strong><\/td>\n<td style=\"width: 92px; text-align: center;\"><strong>724 000<\/strong><\/td>\n<td style=\"width: 145px;\"><strong>Total produits<\/strong><\/td>\n<td style=\"width: 86px; text-align: center;\"><strong>750 000<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 236px;\"><strong>R\u00e9sultat (exploitation)<\/strong><\/td>\n<td style=\"width: 92px; text-align: center;\"><strong>26 000<\/strong><\/td>\n<td style=\"width: 145px;\">&nbsp;<\/td>\n<td style=\"width: 86px;\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Les charges de personnel se d\u00e9composent ainsi :<\/p>\n<table width=\"423\" border=\"1\">\n<tbody>\n<tr>\n<td width=\"183\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"80\"><strong>Salaire brut<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\"><strong>Charges<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\"><strong>Total<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"183\">3 ouvriers<\/td>\n<td style=\"text-align: center;\" width=\"80\">64 800<\/td>\n<td style=\"text-align: center;\" width=\"80\">18 200<\/td>\n<td style=\"text-align: center;\" width=\"80\">83 000<\/td>\n<\/tr>\n<tr>\n<td width=\"183\">Comptable<\/td>\n<td style=\"text-align: center;\" width=\"80\">22 800<\/td>\n<td style=\"text-align: center;\" width=\"80\">6 840<\/td>\n<td style=\"text-align: center;\" width=\"80\">29 640<\/td>\n<\/tr>\n<tr>\n<td width=\"183\">Commercial\/acheteur<\/td>\n<td style=\"text-align: center;\" width=\"80\">25 200<\/td>\n<td style=\"text-align: center;\" width=\"80\">7 560<\/td>\n<td style=\"text-align: center;\" width=\"80\">32 760<\/td>\n<\/tr>\n<tr>\n<td width=\"183\">Dirigeant (y compris RSI)<\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"80\">38 600<\/td>\n<\/tr>\n<tr>\n<td width=\"183\"><strong>Total<\/strong><\/td>\n<td width=\"80\"><strong>112 800<\/strong><\/td>\n<td width=\"80\"><strong>32 600<\/strong><\/td>\n<td width=\"80\"><strong>184 000<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>En plus du dirigeant, l&rsquo;entreprise compte 5 salari\u00e9s (3 ouvriers, un comptable, et un salari\u00e9 s&rsquo;occupant \u00e0 la fois des achats et de la r\u00e9alisation de devis).<\/p>\n<h3><strong>R\u00e9partition charges directes\/indirectes<\/strong><\/h3>\n<p>Afin de calculer le co\u00fbt de revient d&rsquo;un chantier en particulier, le service comptabilit\u00e9, en l&rsquo;absence de contr\u00f4leur de gestion, proc\u00e8de \u00e0 la distinction entre les charges directes et les charges indirectes :<\/p>\n<table width=\"312\" border=\"1\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"232\"><strong>Charges<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\"><strong>Montant<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"232\"><strong>Co\u00fbts directs<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">Mati\u00e8res premi\u00e8res<\/td>\n<td style=\"text-align: center;\" width=\"80\">360 000<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">Main d&rsquo;\u0153uvre directe<\/td>\n<td style=\"text-align: center;\" width=\"80\"><u>83 000<\/u><\/td>\n<\/tr>\n<tr>\n<td width=\"232\"><strong><em>Total co\u00fbt direct<\/em><\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\">443 000<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"232\"><strong>Charges indirectes<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">Autres achats et charges externes<\/td>\n<td style=\"text-align: center;\" width=\"80\">120 000<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">Imp\u00f4ts et taxes<\/td>\n<td style=\"text-align: center;\" width=\"80\">30 000<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">Charges de personnel (hors MOD)<\/td>\n<td style=\"text-align: center;\" width=\"80\">101 000<\/td>\n<\/tr>\n<tr>\n<td width=\"232\">Dotations aux amortissements<\/td>\n<td style=\"text-align: center;\" width=\"80\"><u>30 000<\/u><\/td>\n<\/tr>\n<tr>\n<td width=\"232\"><strong><em>Total co\u00fbt indirect<\/em><\/strong><\/td>\n<td style=\"text-align: center;\" width=\"80\">281 000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Pour les charges de personnel, seuls les 3 ouvriers qui passent leur temps sur les chantiers sont consid\u00e9r\u00e9s comme de la main d&rsquo;\u0153uvre directe.<\/p>\n<p>Conform\u00e9ment \u00e0 la m\u00e9thode des co\u00fbts complets, les charges indirectes sont r\u00e9parties entre 4 centres d&rsquo;analyse reprenant les principaux services de l&rsquo;entreprise (centre approvisionnement, production, commercialisation et administratif).<\/p>\n<p>Pour l&rsquo;affectation des charges indirectes entre ces 4 centres, les r\u00e9partitions suivantes ont \u00e9t\u00e9 d\u00e9cid\u00e9es :<\/p>\n<ul>\n<li>Pour le <strong>loyer<\/strong> (inclus dans les autres achats et charges externes)&nbsp;: 18.000 \u20ac \/ an pour 300 m\u00b2&nbsp;: 150 m\u00b2 (soit 50% de la surface) sont r\u00e9serv\u00e9s pour stocker les approvisionnements, 60 m\u00b2 sont consid\u00e9r\u00e9s pour la production (aspect pr\u00e9paratoire), les 90 m\u00b2 de la maison t\u00e9moin sont consid\u00e9r\u00e9s pour 60 m\u00b2 pour la fonction commercialisation et le reste pour l\u2019aspect administratif (facturation etc.)<\/li>\n<li>Pour la <strong>r\u00e9mun\u00e9ration du dirigeant<\/strong>, une r\u00e9partition en fonction du temps pass\u00e9 \u00e0 chaque fonction a \u00e9t\u00e9 retenue (30% du temps en moyenne \u00e0 s&rsquo;occuper des achats, 40% du temps \u00e0 s&rsquo;occuper de la commercialisation et de la r\u00e9alisation de devis aupr\u00e8s des clients, etc.)<\/li>\n<li>La <strong>r\u00e9mun\u00e9ration du comptable e<\/strong>st exclusivement imput\u00e9e au service administratif et on a consid\u00e9r\u00e9 que le \u00ab\u00a0<strong>commercial\/acheteur<\/strong>\u00a0\u00bb passait 40% de son temps aux achats et 60% \u00e0 la commercialisation. Ainsi, dans le tableau de r\u00e9partition des charges indirectes, les 13.104 \u20ac affect\u00e9s \u00e0 l&rsquo;approvisionnement ont \u00e9t\u00e9 calcul\u00e9s selon la formule suivante : 32.760 x 40% = 13.104 \u20ac.<\/li>\n<\/ul>\n<h3><strong>Tableau de r\u00e9partition des charges indirectes<\/strong><\/h3>\n<table style=\"width: 767px;\" border=\"1\">\n<tbody>\n<tr>\n<td style=\"width: 160px;\">&nbsp;<\/td>\n<td style=\"width: 98px; text-align: center;\"><strong>Total<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>Approvisionnement<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>Production<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>Commercialisation<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>Service administratif<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\"><strong>R\u00e9partition primaire<\/strong><\/td>\n<td style=\"width: 98px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Loyer (r\u00e9parti en fonction de la superficie)<\/td>\n<td style=\"width: 98px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>50%<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>20%<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>20%<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>10%<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">superficie = 150 +50 +100 = 300 m\u00b2<\/td>\n<td style=\"width: 98px; text-align: center;\">18000<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>9 000<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>3 600<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>3 600<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>1 800<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Salaire du dirigeant<\/td>\n<td style=\"width: 98px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>30%<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>30%<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>40%<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>0%<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">&nbsp;<\/td>\n<td style=\"width: 98px; text-align: center;\">36000<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>10 800<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>10 800<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>14 400<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>0<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Co\u00fbt global du comptable<\/td>\n<td style=\"width: 98px; text-align: center;\">29640<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>29 640<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Co\u00fbt global de l&rsquo;acheteur\/commercial<\/td>\n<td style=\"width: 98px; text-align: center;\">32760<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>13 104<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>19 656<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>&nbsp;<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Autres charges indirectes<\/td>\n<td style=\"width: 98px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>30%<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>15%<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>30%<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>25%<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">&nbsp;<\/td>\n<td style=\"width: 98px; text-align: center;\">164 600<\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>49 380<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>24 690<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>49 380<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>41 150<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\"><strong>Total r\u00e9partition primaire<\/strong><\/td>\n<td style=\"width: 98px; text-align: center;\"><strong>281 000<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>82 284<\/strong><\/td>\n<td style=\"width: 93px; text-align: center;\"><strong>39 090<\/strong><\/td>\n<td style=\"width: 158px; text-align: center;\"><strong>87 036<\/strong><\/td>\n<td style=\"width: 110px; text-align: center;\"><strong>72 590<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Unit\u00e9 d&rsquo;\u0153uvre<\/td>\n<td style=\"width: 98px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 110px; text-align: center;\">Montant des achats<\/td>\n<td style=\"width: 93px; text-align: center;\">H de MOD<\/td>\n<td style=\"width: 158px; text-align: center;\">Montant du chiffre d&rsquo;affaires<\/td>\n<td style=\"width: 110px; text-align: center;\">Co\u00fbt de prod des produits vendus<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Nombre d&rsquo;unit\u00e9s d&rsquo;\u0153uvre<\/td>\n<td style=\"width: 98px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 110px; text-align: center;\">360 000<\/td>\n<td style=\"width: 93px; text-align: center;\">4 935<\/td>\n<td style=\"width: 158px; text-align: center;\">750 000<\/td>\n<td style=\"width: 110px; text-align: center;\">564 374<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 160px;\">Co\u00fbt de l&rsquo;unit\u00e9 d&rsquo;\u0153uvre<\/td>\n<td style=\"width: 98px; text-align: center;\">&nbsp;<\/td>\n<td style=\"width: 110px; text-align: center;\">0,23<\/td>\n<td style=\"width: 93px; text-align: center;\">7,92<\/td>\n<td style=\"width: 158px; text-align: center;\">0,12<\/td>\n<td style=\"width: 110px; text-align: center;\">0,13<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Les unit\u00e9s d&rsquo;\u0153uvre ont \u00e9t\u00e9 choisies en retenant des crit\u00e8res habituels (montant des achats pour le centre approvisionnement, nombre d&rsquo;heures de main d&rsquo;\u0153uvre directe pour le service production).<\/p>\n<p><strong>Pour le centre approvisionnement<\/strong>, on consid\u00e8re ainsi que les co\u00fbts indirects li\u00e9s \u00e0 cette fonction vont \u00e9voluer proportionnellement au montant des approvisionnements de la p\u00e9riode.<\/p>\n<p>Nombre d\u2019unit\u00e9 d&rsquo;\u0153uvre approvisionnement =&nbsp;montant des approvisionnements =&nbsp;360.000&nbsp;\u20ac<\/p>\n<p>Co\u00fbt unit\u00e9 d\u2019\u0153uvre =&nbsp;82.284 \u20ac \/ 360.000&nbsp;\u20ac =&nbsp;0,23&nbsp;\u20ac.<\/p>\n<p>Explication&nbsp;: 1&nbsp;\u20ac d\u2019achat de mati\u00e8res premi\u00e8res g\u00e9n\u00e8re \u00e9galement 0,23&nbsp;\u20ac de charges indirectes d\u2019approvisionnement.<\/p>\n<p><strong>Pour le centre production : <\/strong><\/p>\n<p>Calcul du nombre d&rsquo;heures de main d&rsquo;\u0153uvre :<\/p>\n<p>Il est pr\u00e9cis\u00e9 que les 3 ouvriers font des semaines de 35 heures (pas d\u2019heures suppl\u00e9mentaires), et b\u00e9n\u00e9ficient de 5 semaines de cong\u00e9s pay\u00e9s.<\/p>\n<p>Au sens \u00e9conomique, seules 47 semaines sont ainsi travaill\u00e9es<\/p>\n<p>Nombre d&rsquo;heures de MOD = (52 \u2013 5) semaines travaill\u00e9es x 35h semaine x 3 salari\u00e9s = 4.935 heures<\/p>\n<p>Co\u00fbt d&rsquo;unit\u00e9 d&rsquo;\u0153uvre centre production = 39.039 \/ 4.935 = 7,92 \u20ac<\/p>\n<p>Pour chaque heure de main d&rsquo;\u0153uvre directe r\u00e9alis\u00e9e, en plus de la r\u00e9mun\u00e9ration des ouvriers, l&rsquo;entreprise subit 7,92 \u20ac de charges indirectes de production par heure de MOD r\u00e9alis\u00e9e.<\/p>\n<p>Pour les besoins de l&rsquo;exercice, il est pr\u00e9cis\u00e9 que le co\u00fbt de production des produits vendus au cours de l&rsquo;exercice pr\u00e9c\u00e9dent s&rsquo;\u00e9levait \u00e0 564.374 \u20ac.<\/p>\n\n\n<article class=\"obj_encart-formation\">\n<div class=\"ctn_encart\">\n<h3>Votre formation sur ce th\u00e8me<\/h3>\n<h2>&nbsp;LE TRAITEMENT COMPTABLE DES CHARGES DE PERSONNEL&nbsp;<\/h2>\n<h4>1 demi-journ\u00e9e \u2013 \u00c0 distance<\/h4>\n<ul>\n<li><strong>Ma\u00eetriser les principes<\/strong> de l\u2019organisation comptable et la place des charges de personnel dans les diff\u00e9rents documents comptables<\/li>\n    \t\t<li><strong>Identifier les diff\u00e9rents param\u00e8tres<\/strong> des enregistrements comptables<\/li>\n\t\t\t<li><strong>Ma\u00eetriser les \u00e9tapes<\/strong> de l\u2019enregistrement comptable de la paye<\/li>\n<\/ul>\n<div class=\"ctn_btn\">\n<a class=\"obj_btn\" target=\"_blank\" href=\"https:\/\/www.gereso.com\/CPER\" rel=\"noopener\"><span>En savoir plus<\/span><\/a>\n<a class=\"obj_btn\" target=\"_blank\" href=\"https:\/\/www.gereso.com\/client\/programme-pdf\/CPER.pdf\" rel=\"noopener\"><span>T\u00e9l\u00e9charger le programme PDF<\/span><\/a>\n<\/div>\n<\/div>\n<\/article>\n\n\n\n<h3><strong>Le calcul des co\u00fbts<\/strong><\/h3>\n<p>Le dirigeant de BTP+ souhaiterait savoir le b\u00e9n\u00e9fice r\u00e9el qu\u2019il effectue sur un chantier en particulier, celui relatif \u00e0 la construction d&rsquo;un garage. Les frais directs ont \u00e9t\u00e9 les suivants :<\/p>\n<ul>\n<li>15.000 \u20ac de mat\u00e9riaux et mati\u00e8res premi\u00e8res.<\/li>\n<li>Les 3 ouvriers de l\u2019entreprise ont particip\u00e9 \u00e0 cette construction (150 heures de travail en tout).<\/li>\n<\/ul>\n<p>Montant factur\u00e9&nbsp;: 27.000 \u20ac<\/p>\n<h4><strong>Co\u00fbt d&rsquo;achat des mati\u00e8res<\/strong><\/h4>\n<table width=\"492\" border=\"1\">\n<tbody>\n<tr>\n<td width=\"251\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"72\"><strong>Quantit\u00e9<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"79\"><strong>Co\u00fbt Unitaire<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"91\"><strong>Total<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"251\">Achat de mati\u00e8res premi\u00e8res<\/td>\n<td style=\"text-align: center;\" width=\"72\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"79\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"91\">15 000,00<\/td>\n<\/tr>\n<tr>\n<td width=\"251\">Charges indirectes d&rsquo;approvisionnement<\/td>\n<td style=\"text-align: center;\" width=\"72\">15 000<\/td>\n<td style=\"text-align: center;\" width=\"79\">0,23<\/td>\n<td style=\"text-align: center;\" width=\"91\">3 428,50<\/td>\n<\/tr>\n<tr>\n<td width=\"251\"><strong>Co\u00fbt d&rsquo;achat<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"72\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"79\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"91\"><strong>18 428,50<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Charges indirectes d&rsquo;approvisionnement&nbsp;<\/strong><\/p>\n<p>Unit\u00e9 d\u2019\u0153uvre pour le centre approvisionnement&nbsp;: montant des approvisionnements (ou on peut dire 1 \u20ac d\u2019achat de mati\u00e8res premi\u00e8res).<\/p>\n<p>Co\u00fbt de l\u2019unit\u00e9 d\u2019\u0153uvre (selon tableau)&nbsp;: 0,23 \u20ac<\/p>\n<p>Cela signifie que pour 1 \u20ac de mati\u00e8re achet\u00e9e on a 0,23 \u20ac de charges indirectes d\u2019approvisionnement.<\/p>\n<p>Pour le chantier, 15.000 \u20ac de mati\u00e8res premi\u00e8res ont \u00e9t\u00e9 achet\u00e9es. Pour d\u00e9terminer les charges indirectes d\u2019approvisionnement que l\u2019on peut affecter au chantier, il faut faire un produit en croix (ou une r\u00e8gle de 3)&nbsp;:<\/p>\n<p>1 \u20ac de MP &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; \u2194 0,23 \u20ac de CI<\/p>\n<p>15.000 \u20ac de MP &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; \u2194&nbsp;? (x)<\/p>\n<p>Produit en croix&nbsp;: x = (15.000 x 0,23)\/1&nbsp; = 3.428,50 \u20ac de charges indirectes d\u2019approvisionnement affect\u00e9es au chantier.<\/p>\n<h4><strong>Co\u00fbt de production <\/strong><\/h4>\n<table width=\"492\" border=\"1\">\n<tbody>\n<tr>\n<td width=\"251\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"72\"><strong>Quantit\u00e9<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"79\"><strong>Co\u00fbt Unitaire<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"91\"><strong>Total<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"251\">Co\u00fbt d&rsquo;achat<\/td>\n<td style=\"text-align: center;\" width=\"72\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"79\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"91\">18 428,50<\/td>\n<\/tr>\n<tr>\n<td width=\"251\">Main d&rsquo;\u0153uvre directe<\/td>\n<td style=\"text-align: center;\" width=\"72\">150<\/td>\n<td style=\"text-align: center;\" width=\"79\">16,82<\/td>\n<td style=\"text-align: center;\" width=\"91\">2 522,80<\/td>\n<\/tr>\n<tr>\n<td width=\"251\">Charges indirectes de production<\/td>\n<td style=\"text-align: center;\" width=\"72\">150<\/td>\n<td style=\"text-align: center;\" width=\"79\">7,92<\/td>\n<td style=\"text-align: center;\" width=\"91\">1 188,15<\/td>\n<\/tr>\n<tr>\n<td width=\"251\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"72\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"79\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"91\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"251\"><strong>Co\u00fbt de production des produits fabriqu\u00e9s<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"72\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"79\"><strong>&nbsp;<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"91\"><strong>22 139,44<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Pour le co\u00fbt horaire de la main d\u2019\u0153uvre directe, on a proc\u00e9d\u00e9 au calcul suivant&nbsp;:<\/p>\n<p>Co\u00fbt horaire = 83.000 \/ 4.935 heures = 16,82 \u20ac de l&rsquo;heure<\/p>\n<p><strong>&nbsp;<\/strong><strong>Charges indirectes de production :<\/strong><\/p>\n<p>Unit\u00e9 d\u2019\u0153uvre centre fabrication&nbsp;: nombre d\u2019heure de main d\u2019\u0153uvre<\/p>\n<p>Co\u00fbt d\u2019unit\u00e9 d\u2019\u0153uvre =7,92 \u20ac<\/p>\n<p>Cela signifie que pour 1 h de main d&rsquo;\u0153uvre, on a 7,92 \u20ac de charges indirectes. Le chantier n\u00e9cessite 150 heures de fabrication.<\/p>\n<p>A nouveau, il est n\u00e9cessaire de faire un produit en croix&nbsp;:<\/p>\n<p>1h de MOD&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; \u2194 7,92 \u20ac<\/p>\n<p>150h de MOD &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; \u2194&nbsp;? (x)<\/p>\n<p>Produit en croix&nbsp;: x = (150 x 7,92)\/1 = 1.188,15 \u20ac de charges indirectes de production que l\u2019on peut affecter au chantier.<\/p>\n<p><strong>Co\u00fbt de revient <\/strong><\/p>\n<table style=\"width: 505px;\" width=\"505\" border=\"1\">\n<tbody>\n<tr>\n<td width=\"257\">&nbsp;<\/td>\n<td width=\"75\"><strong>Quantit\u00e9<\/strong><\/td>\n<td width=\"80\"><strong>Co\u00fbt Unitaire<\/strong><\/td>\n<td width=\"93\"><strong>Total<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Co\u00fbt de production des produits vendus<\/td>\n<td style=\"text-align: center;\" width=\"75\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"93\">22 139,44<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Charges indirectes distribution<\/td>\n<td style=\"text-align: center;\" width=\"75\">27 000<\/td>\n<td style=\"text-align: center;\" width=\"80\">0,12<\/td>\n<td style=\"text-align: center;\" width=\"93\">3 133,30<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Charges indirectes administratif<\/td>\n<td style=\"text-align: center;\" width=\"75\">22 139,44<\/td>\n<td style=\"text-align: center;\" width=\"80\">0,13<\/td>\n<td style=\"text-align: center;\" width=\"93\">2 847,58<\/td>\n<\/tr>\n<tr>\n<td width=\"257\"><strong>Co\u00fbt de revient<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"75\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"80\">&nbsp;<\/td>\n<td style=\"text-align: center;\" width=\"93\"><strong>28 120,32<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Calcul du r\u00e9sultat<\/strong><\/p>\n<table style=\"height: 248px; width: 505px;\" width=\"505\" border=\"1\">\n<tbody>\n<tr style=\"height: 80px;\">\n<td style=\"height: 80px; width: 234px;\">&nbsp;<\/td>\n<td style=\"height: 80px; width: 75px; text-align: center;\"><strong>Quantit\u00e9<\/strong><\/td>\n<td style=\"height: 80px; width: 79px; text-align: center;\"><strong>Co\u00fbt Unitaire<\/strong><\/td>\n<td style=\"height: 80px; width: 89px; text-align: center;\"><strong>Total<\/strong><\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px; width: 234px;\">Chiffre d&rsquo;affaires<\/td>\n<td style=\"height: 56px; width: 75px; text-align: center;\">&nbsp;<\/td>\n<td style=\"height: 56px; width: 79px; text-align: center;\">&nbsp;<\/td>\n<td style=\"height: 56px; width: 89px; text-align: center;\">27 000,00<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px; width: 234px;\">Co\u00fbt de revient<\/td>\n<td style=\"height: 56px; width: 75px; text-align: center;\">&nbsp;<\/td>\n<td style=\"height: 56px; width: 79px; text-align: center;\">&nbsp;<\/td>\n<td style=\"height: 56px; width: 89px; text-align: center;\">28 120,32<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px; width: 234px;\"><strong>R\u00e9sultat analytique<\/strong><\/td>\n<td style=\"height: 56px; width: 75px; text-align: center;\">&nbsp;<\/td>\n<td style=\"height: 56px; width: 79px; text-align: center;\">&nbsp;<\/td>\n<td style=\"height: 56px; width: 89px; text-align: center;\"><strong>-1 120,32<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Sur ce chantier, l&rsquo;entreprise a perdu 1.120,32 \u20ac. Le chantier est donc d\u00e9ficitaire contrairement \u00e0 l&rsquo;ensemble des op\u00e9rations de l&rsquo;ann\u00e9e (b\u00e9n\u00e9fice global = 26.000 \u20ac).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Article mis \u00e0 jour le 12 juillet 2021 La m\u00e9thode des co\u00fbts complets Calcul du co\u00fbt de revient : premi\u00e8re approche Pour d\u00e9terminer le co\u00fbt de revient d&rsquo;un produit ou d&rsquo;une prestation, la m\u00e9thode la plus connue est celle des co\u00fbts complets. Elle se base largement sur les donn\u00e9es fournies par les services comptables et [&hellip;]<\/p>\n","protected":false},"author":45,"featured_media":8330,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_mi_skip_tracking":false,"footnotes":""},"categories":[12,3],"tags":[1207,1201,1209,1208,1202],"class_list":["post-8320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualites","category-comptabilite-fiscalite-et-gestion-financiere","tag-charge-de-personnel","tag-cout-de-revient","tag-exercice","tag-methode-des-couts-complets","tag-mod"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Charges de personnel et co\u00fbt de revient - Le Blog GERESO<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Charges de personnel et co\u00fbt de revient - Le Blog GERESO\" \/>\n<meta property=\"og:description\" content=\"Article mis \u00e0 jour le 12 juillet 2021 La m\u00e9thode des co\u00fbts complets Calcul du co\u00fbt de revient : premi\u00e8re approche Pour d\u00e9terminer le co\u00fbt de revient d&rsquo;un produit ou d&rsquo;une prestation, la m\u00e9thode la plus connue est celle des co\u00fbts complets. Elle se base largement sur les donn\u00e9es fournies par les services comptables et [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/\" \/>\n<meta property=\"og:site_name\" content=\"Le Blog GERESO\" \/>\n<meta property=\"article:published_time\" content=\"2017-07-31T08:00:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-19T14:47:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Damien P\u00e9an\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/\",\"url\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/\",\"name\":\"Charges de personnel et co\u00fbt de revient - Le Blog GERESO\",\"isPartOf\":{\"@id\":\"https:\/\/www.gereso.com\/actualites\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg\",\"datePublished\":\"2017-07-31T08:00:55+00:00\",\"dateModified\":\"2021-07-19T14:47:23+00:00\",\"author\":{\"@id\":\"https:\/\/www.gereso.com\/actualites\/#\/schema\/person\/c91814f92d627ed4715993fbbf7c7e8d\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#primaryimage\",\"url\":\"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg\",\"contentUrl\":\"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg\",\"width\":600,\"height\":400,\"caption\":\"charges de personnel et co\u00fbts de revient\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.gereso.com\/actualites\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Charges de personnel et co\u00fbt de revient\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gereso.com\/actualites\/#website\",\"url\":\"https:\/\/www.gereso.com\/actualites\/\",\"name\":\"Le Blog GERESO\",\"description\":\"Toute l&#039;actu RH, Finance, Fonction Publique, Management...\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gereso.com\/actualites\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gereso.com\/actualites\/#\/schema\/person\/c91814f92d627ed4715993fbbf7c7e8d\",\"name\":\"Damien P\u00e9an\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.gereso.com\/actualites\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2016\/03\/damien-pean.jpg\",\"contentUrl\":\"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2016\/03\/damien-pean.jpg\",\"caption\":\"Damien P\u00e9an\"},\"description\":\"Damien P\u00c9AN est titulaire du Dipl\u00f4me d'\u00e9tudes sup\u00e9rieures comptables et financi\u00e8res (DESCF). Il intervient depuis plusieurs ann\u00e9es aupr\u00e8s d'\u00e9tudiants en licence de comptabilit\u00e9 et de gestion, \u00e0 qui il enseigne le contr\u00f4le de gestion, la comptabilit\u00e9 approfondie, le management, la fiscalit\u00e9, le droit des soci\u00e9t\u00e9s et le droit du travail. Il intervient \u00e9galement en formation continue pour le compte de divers organismes de formation sur des th\u00e9matiques techniques en comptabilit\u00e9 et fiscalit\u00e9. Il forme aussi un public de non-initi\u00e9s aux fondamentaux de la finance.\",\"url\":\"https:\/\/www.gereso.com\/actualites\/author\/d-pean\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Charges de personnel et co\u00fbt de revient - Le Blog GERESO","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/","og_locale":"fr_FR","og_type":"article","og_title":"Charges de personnel et co\u00fbt de revient - Le Blog GERESO","og_description":"Article mis \u00e0 jour le 12 juillet 2021 La m\u00e9thode des co\u00fbts complets Calcul du co\u00fbt de revient : premi\u00e8re approche Pour d\u00e9terminer le co\u00fbt de revient d&rsquo;un produit ou d&rsquo;une prestation, la m\u00e9thode la plus connue est celle des co\u00fbts complets. Elle se base largement sur les donn\u00e9es fournies par les services comptables et [&hellip;]","og_url":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/","og_site_name":"Le Blog GERESO","article_published_time":"2017-07-31T08:00:55+00:00","article_modified_time":"2021-07-19T14:47:23+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg","type":"image\/jpeg"}],"author":"Damien P\u00e9an","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/","url":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/","name":"Charges de personnel et co\u00fbt de revient - Le Blog GERESO","isPartOf":{"@id":"https:\/\/www.gereso.com\/actualites\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#primaryimage"},"image":{"@id":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg","datePublished":"2017-07-31T08:00:55+00:00","dateModified":"2021-07-19T14:47:23+00:00","author":{"@id":"https:\/\/www.gereso.com\/actualites\/#\/schema\/person\/c91814f92d627ed4715993fbbf7c7e8d"},"breadcrumb":{"@id":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#primaryimage","url":"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg","contentUrl":"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2017\/07\/charges-de-personnel-et-couts-de-revient.jpg","width":600,"height":400,"caption":"charges de personnel et co\u00fbts de revient"},{"@type":"BreadcrumbList","@id":"https:\/\/www.gereso.com\/actualites\/2017\/07\/31\/charges-de-personnel-cout-de-revient\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.gereso.com\/actualites\/"},{"@type":"ListItem","position":2,"name":"Charges de personnel et co\u00fbt de revient"}]},{"@type":"WebSite","@id":"https:\/\/www.gereso.com\/actualites\/#website","url":"https:\/\/www.gereso.com\/actualites\/","name":"Le Blog GERESO","description":"Toute l&#039;actu RH, Finance, Fonction Publique, Management...","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gereso.com\/actualites\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/www.gereso.com\/actualites\/#\/schema\/person\/c91814f92d627ed4715993fbbf7c7e8d","name":"Damien P\u00e9an","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.gereso.com\/actualites\/#\/schema\/person\/image\/","url":"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2016\/03\/damien-pean.jpg","contentUrl":"https:\/\/www.gereso.com\/actualites\/wp-content\/uploads\/2016\/03\/damien-pean.jpg","caption":"Damien P\u00e9an"},"description":"Damien P\u00c9AN est titulaire du Dipl\u00f4me d'\u00e9tudes sup\u00e9rieures comptables et financi\u00e8res (DESCF). Il intervient depuis plusieurs ann\u00e9es aupr\u00e8s d'\u00e9tudiants en licence de comptabilit\u00e9 et de gestion, \u00e0 qui il enseigne le contr\u00f4le de gestion, la comptabilit\u00e9 approfondie, le management, la fiscalit\u00e9, le droit des soci\u00e9t\u00e9s et le droit du travail. Il intervient \u00e9galement en formation continue pour le compte de divers organismes de formation sur des th\u00e9matiques techniques en comptabilit\u00e9 et fiscalit\u00e9. Il forme aussi un public de non-initi\u00e9s aux fondamentaux de la finance.","url":"https:\/\/www.gereso.com\/actualites\/author\/d-pean\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/posts\/8320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/comments?post=8320"}],"version-history":[{"count":11,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/posts\/8320\/revisions"}],"predecessor-version":[{"id":22464,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/posts\/8320\/revisions\/22464"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/media\/8330"}],"wp:attachment":[{"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/media?parent=8320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/categories?post=8320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gereso.com\/actualites\/wp-json\/wp\/v2\/tags?post=8320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}